Return to Course List


Stormwater Management Training - Multi-Sector General Permit: Control Measures and Corrective Actions

Mobile Compatible Mobile Compatible

Per Seat Cost: 25 Points

Material Code: 72829





Stormwater Management Training - Multi-Sector General Permit: Control Measures and Corrective Actions

Course Length: 20 Minutes English/21 Minutes Spanish

Video Runtime: 15:14 English/17:43 Spanish

Inteded Audience: Operators, Inspectors, and all other employees working in an industrial area exposed to stormwater.

Overview: Industrial stormwater comes from rainfall or snowmelt runoff that contacts industrial materials. It then runs offsite and enters drainage systems or receiving waters. The Environmental Protection Agency (EPA) requires industrial facilities to have a Multi-Sector General Permit (MSGP) to discharge stormwater. Federal regulations require stormwater discharges associated with specific categories of industrial activity to be covered under NPDES permits. Its main goal is to make sure you manage stormwater in a way that limits pollutants.

This training is designed to teach Stormwater team members about the control measures required by the MSGP. It will also cover the requirements for taking corrective action when certain conditions are identified at their site.

NOTE: This training is offered as a part of a more comprehensive curriculum on this topic. See the description for the Stormwater Management Training - Multi-Sector General Permit Curriculum for additional information.

Objectives:

After completing this training, learners will be able to:

  • Identify the control measures required to meet effluent limitations
  • Recognize how to design, install, and maintain control measures
  • Explain when and how to complete and log corrective actions

Outline:

Stormwater Management Training - Multi-Sector General Permit: Control Measures and Corrective Actions covers the following topics:

Introduction

  • Introduction
  • What You'll Learn

Control Measures

  • Minimize Exposure
  • Good Housekeeping
  • Erosion and Sediment Controls
  • Spill Prevention and Response
  • Design, Installation, and Maintenance

Corrective Actions

  • Conditions Triggering Corrective Action
  • Corrective Action Deadlines
  • Additional Implementation Measures (AIM)

Conclusion

  • Summary

Regulations Covered: 40 CFR §122

Copyright Date: 2023


Visit our Online Training Course Demo page...

Minimum Passing Score:

Apply Passing Score to:

   Cancel

Deleting this Training Reminder will remove all existing occurrences of this reminder and will stop all scheduled future reminders for this course.

   Cancel


Access to this function has been disabled by your Training Coordinator. If you have questions, please contact:





Click here to view the permissions that your Training Coordinator has set for your account.